top of page

KITCHEN & BATH CABINETRY
INSTALLATION

Local Family-Owned Advantage

  • Personal attention and customized design service

  • 5-Star Reputation - Many repeat customers

  • We invest in our local Cincinnati communities 

  • Quick response times and flexible scheduling

  • We employ our contractors and support the local economy and craftspeople

 

Quality Assurance

  • 35+ Years of home renovation experience

  • Licensed and insured for your protection

  • Manufacturer warranties on materials

  • Workmanship guarantee on installation

  • Quality control inspections at every step

Streamlined Process

  • Kitchen and bath renovations for all budgets, shapes, and designs

  • Single-source responsibility for stone cabinetry and countertop design, fabrication, and installation

  • Coordinated scheduling and project management

  • Clear communication throughout the project

  • Transparent pricing with no hidden fees

89.jpg

Kitchen Cabinet Installation

What Does the Process Look Like to Replace My Kitchen Cabinets?

  1. Your kitchen cabinet installer will begin by checking the walls and floors in your kitchen for uneven areas, marking any highs or lows.

  2. A carpenter’s square will be used to check the square of each corner, then the top of the cabinets will be marked by measuring up the wall from the highest point on the floor.

  3. All wall studs will be located and marked, and suspension rails will be installed. 

  4. Either a corner cabinet or a cabinet that fits against both a back and side wall will be installed first, attached to the suspension rail.

  5. All remaining cabinets will be hung,

  6. Then the adjacent cabinets will be screwed together.

  7. After final adjustments are made, all mounting hardware will be tightened.

  8. When the upper cabinets are hung, the lower cabinets will be installed, using the same basic process.

  9. A miter box will be used to cut and install any molding or cornices after filler pieces are caulked.

  10. The countertop and sink will be installed

  11. The shelving, doors, and drawers of the cabinets are installed

  12. Finally, the knobs and handles are installed

  13. After the project has reached your every expectation

  14. We will clean, pack our tools and materials, and leave you to enjoy your beautiful new kitchen cabinets...

  • Facebook

Call or Text

8111 Regal Lane West Chester, OH 45069

Tuesday             9-5

Wednesday       9-7

Thursday           9-5

Friday                 9-5

Saturday            9-2

Closed Sun & Mon

Fabrication Facility

6345 Castle Dr Mason, OH 45040

© 2025 Countertops and Cabinetry By Design

    AKA CAC BY DESIGN  www.cacbydesign.com

Contact Us

bottom of page